Coral Springs begins road resurfacing Monday; use caution when driving
Pavex Corporation will perform Roadway Resurfacing and Striping, near Mullins Park starting Monday, March 29.
Construction will take place in the following areas:
- Coral Hills Drive, from Sample Road to 28 St.
- 29 St., from Coral Hills to Coral Springs Drive
- 99 Ave., from 29th St. to 99 Way
- 31st Court, from Coral Hills Drive to University Drive
- 28th St, from Coral Hills Drive to University Drive
- 95th Ave., from 31st St to Royal Palm Blvd.
- 28th Place and 28 Court, between 97 Ave. and Coral Hills Drive and between 98 Way and 99 Ave
- 97 Lane, from 25 St. to Royal Palm Blvd.
- 96 Way and 95 Terrace north of Royal Palm
- and 23 Court, from 95 Terrace to 95 Ave.
Construction will occur tentatively between 8 a.m. to 4 p.m. until the resurfacing project is complete. Construction is anticipated to end in June 2010. For more information, contact the Streets Division at
Related posts:
- Coral Springs firefighters to wear pink
- Coral Springs accepting grant applications for Coral Springs events
- Three Coral Springs teens killed in wreck early Sunday
- Group tennis lessons and Junior Tennis Academy in Coral Springs
- Coral Springs briefs
Short URL: https://browardnetonline.com/?p=7296